align portal — design system v0.1
the building blocks of the align portal. brand-locked colors, considered type, restrained components. every primitive on this page maps to a brand rule, not a designer's instinct.
01 / palette
khaki and moss ground the brand in nature. orange is reserved — it only appears on calls-to-action, sign-off prompts, and payment moments. stone and mushroom carry surfaces.
#4f5641
primary text + brand block
#ea5e11
CTA, sign-off, payment
#000000
luxe block, dream-home
#88927a
#d9d6cd
#edeae7
#bbc2ae
#ffffff
paper
white card on stone background. default for content panels.
mushroom
soft fill for nested or quiet panels.
khaki block
brand block. headers, hero strips, callouts.
ink
reserved for luxe contexts — dream-home, framer moments.
02 / typography
headers are alwayslowercase — even proper nouns. the only exception is the standalone word "I". mulish for headers (a stand-in for hero new), jost for body, mulish light for sub-headers.
forever home, on a quiet hill
stage 1 — concept design
next milestone
feasibility presentation
clarity and control, before commitment.
By the time Cara reaches Align, the comparison is often over. Someone she trusts has told her this is the firm. We design for that conviction — calm, considered, never loud.
signed · stage 0 · 14 days ago
03 / components
orange is reserved for sign-off, payment, and primary CTAs only. khaki carries everyday actions.
outlined only — never solid. moss green by default; orange when used as a CTA marker.
the canonical project journey, mapped from the align value stream. every project sits at exactly one stage at a time. sign-off events advance it.
just started — sketch design
mid-flight — DA in council
finishing line — CD + BA
04 / putting it together
a small composition showing how the primitives lock together for cara's view. mobile-first, calm, scannable. status, money, documents, next step.
your project
with davies construction · principal saxon hall
next step
concept presentation — thursday 9:30am
joint meeting with saxon and the davies team. we'll walk through the two refined options and the concept budget.
paid & outstanding
$26,000 / $82,000
stages 0 & 1 deposit complete
your documents
needs & wants — hill house
signed · stage 0
sketch design — option B (final)
signed · stage 0
client architect agreement (CAA)
signed · stage 0
concept design pack v1
updated 3 days ago
ask align
what was decided about the kitchen window?
ask anything about your project. answers come from your meeting minutes, drawings, and emails — sources cited.
05 / reference
straight from the align value stream map — total enquiry-to-build duration ~49–90 weeks. every stage in the portal mirrors this structure exactly.
sales
lead through to project commencement. enquiry, application, discovery call, deposit. handover from go high level.
~18 business days
sketch design
site visit through to client architect agreement signed. two sketch options, refined option, pre-build feasibility.
3–7 weeks
concept design
brief through to signed concept and budget alignment. concept estimate package, builder estimate, alignment.
10–20 weeks
development application
DA documentation, council lodgement and permit assessment. ends with DA permit received.
6–13 weeks
interior design
interior design, finishes, joinery pricing and sign-off. ends with detailed drawings signed.
10–16 weeks
construction docs + BA
engineering coordination, contract estimate, building approvals, build contract signed and construction start.
20–34 weeks